Three preset schedules

Outcome

By the end of this lesson, you will be able to apply the right preset schedule (Business Hours, Peak Hours, Weekend Scale-Down) to a workload and explain when to customize from a preset.


TierOperator
JTBD”Get a sensible schedule running in under 30 seconds.”
PersonasAll product users
PrerequisitesL1–L3
Time8 minutes
Bloom verbApply (Apply) and Explain (Understand)

1. Concept

Most schedules in production fall into three patterns. ZopNight ships three preset schedules that cover these patterns. Customers can use a preset as-is or as a starting point to customize. The presets are documented; they are not magic.

Preset 1: Business Hours

Terminal window
NAME: Business Hours
INTENT: Resources ON during business hours, OFF outside
TIMEZONE: (customer picks at apply time)
CRONS:
Cron #1 "0 8 * * 1-5" Start weekdays 8 AM
Cron #2 "0 20 * * 1-5" Stop weekdays 8 PM
Cron #3 "0 0 * * 0,6" Stop midnight Saturday and Sunday
(belt-and-suspenders weekend stop)
COVERAGE:
ON hours/week: 60 (12h × 5 weekdays)
OFF hours/week: 108
Theoretical savings vs always-on: 64.3%
Realistic savings (0.7× realism factor): ~45%
BEST FOR:
Dev, staging, test environments used during business hours
Long-running workloads that don't need 24/7 availability

This is the canonical preset. About 70% of customer schedules are this pattern with minor timezone or hour adjustments.

Preset 2: Peak Hours

Terminal window
NAME: Peak Hours
INTENT: Scale UP during peak traffic, scale DOWN off-peak
TIMEZONE: (customer picks)
CRONS:
Cron #1 "0 11 * * *" Start (or Scale up) daily 11 AM
Cron #2 "0 22 * * *" Stop (or Scale down) daily 10 PM
COVERAGE:
ON hours/week: 77 (11h × 7 days)
OFF hours/week: 91
Theoretical savings vs always-on: 54.2%
BEST FOR:
Production capacity above the floor: autoscaler scale-out triggers
Workloads with predictable diurnal traffic (consumer apps, marketing
workloads)
NOT FOR:
Always-on production (use a different pattern)
Workloads with weekend traffic peaks (customize the days field)

Peak Hours is the right preset for additional capacity above the always-on floor, not for the always-on baseline itself. Use with autoscaling rather than start/stop where appropriate.

Preset 3: Weekend Scale-Down

Terminal window
NAME: Weekend Scale-Down
INTENT: Scale OFF entirely for the weekend
TIMEZONE: (customer picks)
CRONS:
Cron #1 "0 0 * * 6" Stop midnight Saturday (Friday night)
Cron #2 "0 8 * * 1" Start Monday 8 AM
COVERAGE:
ON hours/week: ~112 (Mon 8am - Sat midnight)
OFF hours/week: ~56
Theoretical savings vs always-on: 33.3%
BEST FOR:
Workloads that run weekdays but should be OFF entirely on weekends
Cost-sensitive dev environments where weekend usage is rare
Backup of business hours pattern for engineers in unusual hours
NOT FOR:
Production that serves weekend traffic

Weekend Scale-Down is gentler than Business Hours (doesn’t stop nightly). Good fit for teams whose engineers occasionally work late but never weekends.

How presets behave on apply

When a customer chooses a preset:

Terminal window
1. Click "Use preset Business Hours"
2. Customer picks the timezone for this instance
3. Customer reviews the auto-generated crons (visible, editable)
4. Customer renames if needed (default: "Business Hours")
5. Save
6. Attach resources (L5)

The preset is not a special schedule type. It is a regular schedule, just pre-populated with the canonical crons. The customer can edit any cron after applying the preset.

When to customize from a preset

Three common customizations:

1. Shift the hours. Different team, different working hours. Edit the cron from 0 8 to 0 9 for a 9 AM start.

2. Add a region-specific shift. A team in Asia/Kolkata applies Business Hours preset, but their workday is 10 AM - 7 PM. Edit cron #1 from 0 8 * * 1-5 to 0 10 * * 1-5 and cron #2 from 0 20 * * 1-5 to 0 19 * * 1-5.

3. Add a Friday early-stop. Some teams finish early Friday. Add a cron 0 17 * * 5 for “Stop at 5 PM Friday” as a more aggressive stop on top of the Business Hours preset.

When to NOT use presets

Two situations:

  • Complex schedules (rolling environments, freeze windows, demo prod). These deserve custom design: see T5.M5.2.
  • Tightly coupled to specific workload behavior. A workload that runs every Tuesday for 3 hours doesn’t match any preset. Build a custom schedule.

For everything else, presets are the right starting point.


2. Demo

Customer onboarding flow with presets:

Terminal window
T+0 Customer connects AWS account
T+10 min Discovery completes; 187 non-prod resources discovered
T+11 min Customer goes to Schedules → New
T+11 min Choose "Use preset: Business Hours"
T+11 min Pick timezone: America/Los_Angeles
T+12 min Verify crons in the grid
T+12 min Save (still empty)
T+13 min Attach: filter resources to environment=dev (the grouped filter
from M1.2), bulk-select all 187, attach to schedule
T+14 min Schedule is active. Next firing: Monday 8 AM PT, will stop all
187 resources
REALIZED MONTHLY SAVINGS (first month): $22,300

Fifteen minutes from cloud connection to active scheduling on 187 resources. Presets are the reason it’s that fast.


3. Hands-on (5 min)

Apply one of the three presets:

Terminal window
1. Schedules → New Schedule.
2. Choose "Use preset" → pick "Business Hours" (or whichever fits).
3. Pick your team's timezone.
4. Review the crons: verify the human-readable preview matches intent.
5. View the 24-hour grid: check for any gap or overlap.
6. Customize if needed (e.g., shift start to 9 AM instead of 8 AM).
7. Save.
8. Do NOT attach resources yet: that is L5.
If the preset doesn't match your team's working hours:
- Edit the start cron's hour field
- Edit the stop cron's hour field
- The day-of-week field stays the same (1-5 for weekdays)
- The grid updates as you type

4. Knowledge check

Q1

The Business Hours preset has three crons. The third is a redundant weekend stop. The reason it exists:

A. Backwards compatibility
B. Belt-and-suspenders: catches the case where a manual start fires on Friday evening and would otherwise leave the resource running all weekend. Idempotent on already-stopped resources.
C. Performance
D. Required by AWS

Show answer

Correct: B. The belt-and-suspenders weekend stop is defensive. It does nothing in the normal case (resource already stopped from Friday 8 PM); it catches the edge case of a manual override or late start.

Q2

A team applies the Peak Hours preset to their production EC2 fleet. They start seeing customer impact at 10:30 PM each day. Most likely cause:

A. The preset is broken
B. Peak Hours stops at 10 PM. If the production fleet has actual traffic past 10 PM, the preset is the wrong tool. Production should not be on a start/stop schedule unless explicitly non-24/7. Use autoscaling or a different preset.
C. The cron is off by an hour
D. DST shift

Show answer

Correct: B. Peak Hours is for capacity above the always-on floor, not for the floor itself. Production typically needs an always-on baseline with scale-out triggers, not a start/stop schedule.

Q3

A team in Asia/Kolkata applies the Business Hours preset. They forget to change the timezone from the default (which is the customer’s primary timezone, e.g., America/New_York). The likely outcome:

A. Works fine
B. The schedule fires at 8 AM and 8 PM America/New_York: which is 5:30 PM and 5:30 AM Asia/Kolkata. The Kolkata team finds resources stopping mid-afternoon and starting at dawn. The fix is to set the timezone to Asia/Kolkata.
C. The schedule doesn’t fire
D. AWS rejects the timezone

Show answer

Correct: B. Timezone is per-schedule. A team that doesn’t change it after applying a preset will see crons fire in the default timezone. The grid (L3) would catch this before save: the visual would show “stop at 5:30 PM” not “stop at 8 PM” in the team’s local time.


5. Apply

Presets are in the schedule create dialog:

  • Schedule create: preset picker is the first choice in the dialog
  • Edit any preset’s crons after applying: the preset is a starting point, not a constraint
  • The 24-hour grid renders identically whether the schedule came from a preset or was written from scratch

For complex schedule patterns beyond the three presets, see T5.M5.2.


Glossary terms touched

Business Hours preset · Peak Hours preset · Weekend Scale-Down preset · Preset


Start with the bill.

Foundations takes about five hours. The first lesson is nine minutes.

Open curriculum. No login. No paywall. 237 lessons across 7 courses, three publicly verifiable credentials. Read it on the train, take the exam on a Saturday, list the credential on your résumé Monday.

5h median time to finish Foundations
0 logins, paywalls, or marketing forms
open curriculum, public credential verifier
Multi-cloud automation· Production-ready in 30 min· SOC 2 · ISO 27001· 30% average cloud cost cut· 4 platforms · 1 console· Multi-cloud automation· Production-ready in 30 min· SOC 2 · ISO 27001· 30% average cloud cost cut· 4 platforms · 1 console·