Schedule-and-rollback contract

Outcome

By the end of this lesson, you will be able to trace an event through its lifecycle states, execute rollback (cancel) at the right time, and recover from partial failures.


TierEngineer
JTBD”Understand the event lifecycle so I can monitor, cancel, or recover at any point in the cycle.”
PersonasPlatform Engineer · SRE
PrerequisitesM2.9.L1 · M2.9.L2
Time9 minutes
Bloom verbTrace (Apply), Execute (Apply), Recover (Apply)

1. Concept

Event lifecycle has clear states with defined transitions:

Terminal window
draft → scheduling → scheduled → scaling_up → active → scaling_down → completed
cancelled

Each state has specific behavior. The transitions are deterministic.

State descriptions

Terminal window
draft Event defined but not committed for execution
Customer can edit freely
scheduling Cloud-native scheduled actions being created
Brief state (~seconds)
scheduled Cloud-native actions in place
Event will fire on schedule
Pre-event state; can still cancel cleanly
scaling_up Event start hit; capacity ramping up
Pre-warm in progress
~5-15 minutes typical
active Capacity at event level; traffic served
Main event duration
Can monitor live; can cancel mid-event
scaling_down Event end hit; capacity scaling back
Returning to baseline
~5-15 minutes typical
completed Event finished; baseline restored
Historical state
Audit log available
cancelled Event aborted before completion
Can happen from scheduling/scheduled/scaling_up/active
Triggers cleanup

The states are exhaustive; one state at any time.

Cloud-native scheduled actions

Instead of polling, ZopNight uses each cloud’s native scheduled-action mechanism:

Terminal window
AWS ASG PutScheduledUpdateGroupAction
AWS ECS Application Auto Scaling PutScheduledAction
Azure Autoscale Settings with FixedDate profile
GCP scalingSchedules

These cloud-side actions fire at the configured datetime, no polling required. ZopNight just verifies they’re set correctly.

Terminal window
WHY CLOUD-NATIVE:
More reliable (cloud guarantees execution at scheduled time)
No ZopNight downtime risk
Lower latency to fire
Cloud-provider scheduled action semantics well-tested
ZOPNIGHT'S ROLE:
Create the scheduled actions
Monitor execution
Verify outcomes
Coordinate across multiple targets
Handle rollback

The cloud handles the trigger; ZopNight handles the orchestration.

Rollback design: byte-accurate restoration

Terminal window
ON EVENT START:
Original capacity SAVED: originalMin, originalMax, originalDesired
Cloud actions scale UP to event capacity
Pre-warm complete
ON EVENT END:
Cloud actions scale DOWN to originalMin, originalMax
Original state byte-accurately restored
ROLLBACK IS PROVIDER-AWARE:
AWS ASG: sweep cleans up all "zopnight-event-*" scheduled actions
Prevents leaks of stale scheduled actions
Azure VMSS: reverts the FixedDate profile
Cleans up the temporary profile entries
GCP: cancellation handles map-key deletion
PATCH leaves stale schedules; full Update with ForceSendFields fixes this
Provider-specific quirks handled

The byte-accurate rollback is what makes Event Readiness safe.

Concurrent event handling

Terminal window
SCENARIO: Event 1 active: 30 instances
Event 2 requested overlapping with Event 1
WIZARD REJECTS the second request:
"Concurrent event already scheduled on this target"
CONSTRAINT: per-target, one active event at a time
Prevents conflicting cloud-side actions
Prevents capacity confusion
Forces planning around event overlaps
WORKAROUNDS:
Plan events sequentially (no overlap)
Combine into one larger event with multiple phases
Use different target groups if truly independent

The constraint forces deliberate planning around event overlaps.

Cancel before, during, or after

Terminal window
BEFORE EVENT START (state: scheduled):
CANCEL: removes the cloud-side scheduled action
No infrastructure mutation occurred
No cost incurred yet
Clean abort
DURING EVENT (state: active):
CANCEL: triggers immediate scale-back to original capacity
ZopNight calls cloud APIs to restore
Cost stops at original capacity
Recovery from "wait this isn't going as planned"
AFTER EVENT END (state: completed):
CANCEL: not available; event is historical
Audit log preserved
No infrastructure changes possible

The cancel button is available in any pre-completed state. Different effect depending on state.

Lifecycle event log

Every state transition is logged:

Terminal window
EVENT LOG: black-friday-2026
─────────────────────────────────────────────────────────
T+0d draft created by user@team
T+5 min scheduling triggered
T+10 min scheduled: cloud actions registered
T+25 days scaling_up started (event start hit)
T+25 days+5m active (capacity reached)
T+26 days scaling_down started (event end hit)
T+26 days+10m completed

Audit trail spans the full lifecycle.

Failure handling

Terminal window
SCHEDULING PHASE FAILURE:
Cloud API call fails during scheduling
State: scheduling (stuck)
Customer action: retry via UI; or cancel + recreate
No partial state in cloud
SCALING_UP PHASE FAILURE:
Not all targets reach event capacity (partial scale-up)
State: active (with reduced capacity)
Customer notified
Customer action: cancel or proceed with reduced capacity
SCALING_DOWN PHASE FAILURE:
Not all targets return to baseline
State: stuck in scaling_down
Customer action: retry via UI; or manually verify cloud state
GENERAL FAILURE recovery:
Idempotent operations
Saved state preserved
Audit log captures the failure point
Customer can resume from where it stopped

Failures are visible and recoverable. No silent state corruption.

Notification at each state transition

Terminal window
NOTIFICATIONS FIRE on state transitions:
draft → scheduling: "Event scheduling in progress"
scheduling → scheduled: "Event scheduled successfully for Nov 28"
scheduled → scaling_up: "Event started; pre-warming begin"
scaling_up → active: "Event live; capacity reached"
active → scaling_down: "Event ending; scaling back"
scaling_down → completed: "Event complete; baseline restored"
any → cancelled: "Event cancelled by [user]"
Customer aware of progression
On-call team can monitor
Stakeholders can plan around event

The visibility into state is part of the trust model.


2. Demo

A complete event lifecycle:

Terminal window
DAY -30 draft state
Event configured for Nov 28 00:00 - 23:59 UTC
Capacity multiplier: 3x
Customer reviews configuration
DAY -29 Customer clicks Approve
State: scheduling
ZopNight creates cloud-native scheduled actions:
PutScheduledUpdateGroupAction for ASGs
ECS PutScheduledAction for services
State transition: scheduled
Notification: "Event scheduled successfully"
Cloud-side: scheduled actions now registered
Will fire on Nov 28 00:00 UTC
DAY 0 (Nov 28 00:00 UTC)
Cloud-native action fires
Capacity begins scaling up
ZopNight detects via webhook/poll
State transition: scaling_up
Notification: "Event started; pre-warming"
DAY 0 +5 min Targets reach event capacity
State: active
Notification: "Event live, capacity reached"
DAY 0 +24 hr Cloud-native action fires (event end)
State transition: scaling_down
Notification: "Event ending; scaling back"
DAY 0 +24 hr +10 min
Targets back to baseline
State: completed
Notification: "Event complete, baseline restored"
Cleanup verified: no stale scheduled actions
24-HOUR EVENT cleanly traced:
6 state transitions
4 notifications
Full audit log
Zero manual intervention

24-hour event, full lifecycle traced.


3. Hands-on (5 min)

Trace through an event’s lifecycle:

Terminal window
□ STEP 1: Open Event Readiness; pick an event
Event: __________
Current state: __________
□ STEP 2: Check audit log
draft → scheduling: ___ minutes
scheduling → scheduled: ___ minutes
scheduled → scaling_up: ___ (at event start)
scaling_up → active: ___ minutes
active → scaling_down: ___ (at event end)
scaling_down → completed: ___ minutes
□ STEP 3: Identify state-specific actions taken
scheduling: cloud actions created
scaling_up: capacity ramping
active: traffic served
scaling_down: capacity restoring
□ STEP 4: Verify rollback
Final capacity matches original?
No stale scheduled actions?
Audit complete?
□ STEP 5: Cancel option in current state
Available? □ Yes □ No
What would happen if cancelled?

A 10-minute trace builds confidence in the lifecycle.


4. Knowledge check

Q1

An event in scheduled state: cancel removes:

A. Nothing
B. The cloud-native scheduled action. The cloud-side scaling won’t fire. Infrastructure unchanged. Clean abort before any actual mutation.
C. The event entirely from history
D. Random

Show answer

Correct: B. Cancel pre-execution = remove the cloud-side trigger.

Q2

Concurrent events on the same target:

A. Allowed
B. Rejected: one event per target at a time. Wizard refuses overlapping events. Prevents conflicting cloud-side actions. Forces deliberate planning.
C. Both run with priority
D. Random

Show answer

Correct: B. Concurrent is forbidden per target.

Q3

Event end fires; cloud-side action triggers scale-down. ZopNight’s responsibility:

A. Initiate the scale-down
B. Detect the action (via webhook/poll), update state to scaling_down, verify the targets reach baseline, confirm completed state. ZopNight tracks the lifecycle even though cloud actions drive the mutation.
C. Random
D. AWS handles it

Show answer

Correct: B. ZopNight verifies; cloud actions drive.


5. Apply

Event Readiness UI shows the current state and audit trail for each event.

For your team: trace at least one event end-to-end before relying on it for production.


Glossary terms touched

Event lifecycle · Cloud-native scheduled action · Byte-accurate rollback · Concurrent event constraint


Start with the bill.

Foundations takes about five hours. The first lesson is nine minutes.

Open curriculum. No login. No paywall. 237 lessons across 7 courses, three publicly verifiable credentials. Read it on the train, take the exam on a Saturday, list the credential on your résumé Monday.

5h median time to finish Foundations
0 logins, paywalls, or marketing forms
open curriculum, public credential verifier
Multi-cloud automation· Production-ready in 30 min· SOC 2 · ISO 27001· 30% average cloud cost cut· 4 platforms · 1 console· Multi-cloud automation· Production-ready in 30 min· SOC 2 · ISO 27001· 30% average cloud cost cut· 4 platforms · 1 console·